The short answer
The City of Arlington's permit guide for homeowners says kitchen and bath remodels, wall removals, garage conversions and changes to the existing framework of a home require a permit. It also says cosmetic work, such as repairing or replacing flooring, wallpaper and paint, does not.
So if your plan is new paint, a new floor and new towel bars, you are doing cosmetic work. If your plan includes a new shower valve, a moved drain, new circuits for lights or a fan, or taking down a wall, you are doing a bath remodel in the city's eyes, and it needs a permit.
Bathroom work that needs a permit
These are the parts of a bathroom job that put it on the permit side of the line, because they change the plumbing, electrical or structural parts of the house:
- Replacing or moving a shower or tub valve
- Moving a drain, toilet or sink to a new spot
- Converting a tub to a shower, which changes the drain
- Adding or moving lights, outlets or an exhaust fan circuit
- Removing or moving a wall, or widening a doorway
- Any change to the framing, such as a recessed niche cut into a structural wall
Work that doesn't
Cosmetic changes stay off the permit list. In a bathroom that typically means:
- Painting walls, ceiling and trim
- Replacing floor tile or vinyl without changing the subfloor structure
- New wallpaper
- Swapping a mirror, towel bars or cabinet hardware
Who applies, and how inspections fit the schedule
Arlington's permits run through arlingtonpermits.com and the Planning and Development Services Department at 101 W. Abram St., which takes calls at 817-459-6502. On a remodel, the contractor normally applies, because the permit covers the work they are doing and the inspections happen on their schedule.
Inspections are what a permit buys. The point of the rough-in inspection is that someone checks the drain slope, the valve and the wiring while the walls are open, before tile and drywall hide them for good. On a typical bathroom that means a pause between demolition and rough-in, and the finish trades waiting until the rough-in passes.
Ask who is pulling the permit before you sign. Our list of questions to ask a bathroom remodeler covers that and a few others worth asking.
What the permit line on an estimate covers
HomeGuide's shower installation guide puts permit fees at $50 to $2,000 nationally, depending on the city and the scope. A permit line on a bathroom estimate usually covers the city fee plus the time to apply and meet inspectors.
An estimate with no permit line on a job that clearly needs one is worth a question. Skipping the permit saves little and can cause trouble later: unpermitted plumbing or electrical work can come up when you sell, and you lose the one outside check on the work hidden in your walls.
If you are planning a primary bathroom remodel or a shower replacement, we include the permit and the inspections in our written price.
What to ask before you sign anything
The permit is one of the easiest things to check before you hire, and the answer tells you a lot about the contractor. Ask who is applying, which jobs on the estimate need permits, and where the permit fee shows up in the price.
A contractor who talks easily about inspections, who has to be on site and when, and how a failed inspection is handled is used to working with the city. One who says permits are not needed on a job that moves a drain or a valve is telling you something you should check with Planning and Development Services before work starts.
The homeowner has a stake as well. Work done without a permit can come up when the house is sold or when an insurance claim follows a leak. A permit and a passed inspection are a record that the work was reviewed.
- Which parts of this job need a city permit?
- Who applies for it, and is the fee on the estimate?
- Which inspections happen, and does someone have to be home?
- What happens if an inspector asks for a change?
- Will I get a copy of the permit when the work passes?
How a permit fits the schedule of a bathroom job
A permit adds a step before work begins, so ask for the timeline at the first visit. The application goes in, the city looks it over, and demolition normally starts only after it is issued. During the job, inspections happen at set points, usually before the walls are closed up and again when the work is done.
This is why bathrooms with plumbing changes take longer than cosmetic updates. Plan a little slack around the inspection dates, and keep the bathroom open to the crew on the day they are due. If you are comparing a full remodel with a lighter job, our bathroom remodel cost guide shows how the scope changes both price and schedule.
Permit questions
What Arlington homeowners ask about bathroom permits.
- Can I pull the permit myself as the homeowner?
- Call Planning and Development Services at 817-459-6502 to ask about your case. On a contractor-run remodel, the contractor normally applies.
- Does moving a toilet need a permit?
- Yes. A toilet in a new spot means a new drain, which is plumbing work and part of a bath remodel. For a straight swap in the same spot, ask the permit desk before you start.
- How long does the permit add to the job?
- Mostly the wait for inspections. Plan for a short pause between rough-in and closing up the walls.
- What if I'm in Pantego or Dalworthington Gardens?
- Those are separate cities with their own permit offices. See our Dalworthington Gardens page for that city's rules.