Loading this page…
From a quick powder room refresh to a full primary bath. Pick the job below, or call and describe the room.

Shower, tub, vanity, tile and light, redone together so the room finally works for the two of you.

Out with the cracked tile and the stained grout. In with a shower that is waterproofed before a single tile goes on.

Or swap a tired tub for a new one. Either way, the plumbing, waterproofing and tile are done right.

A new vanity, toilet, floor, mirror and light can change a half bath in a few days.